Local Vendor Program

Wind farm construction is a very specialized process, but it requires common products and services, many of which can be found locally. The typical construction duration for a wind farm is approximately nine months from the start of construction to the commercial operation date. The work consists of upgrading and building new stone roads, forming and pouring large concrete foundations, installing underground electrical systems and overhead high voltage transmission lines, constructing a project specific substation, erecting the wind turbine tower and generator, and completing the mechanical and electrical connections. In addition, there are other general or community needs.

To learn more about the types of services that are needed to support wind farm construction, visit our Building a Wind Farm page.

Local Vendor Directory

AJ'sCollision Repair
Andrew Kirkpatrick
(309) 287-0130
[email protected]

Heritage FS, Inc
Wayne Brokate
(217) 388-2208
[email protected]

Heritage FS, Inc
Chris Claussen
(815) 573-1081
[email protected]

Neal Tire
Todd blankenbeckler
217-784-5512
[email protected]

ProType Printing
Lisa Magers
(217) 379-4715
[email protected]

Ropps Flower Factory
Roger Cramer
(217) 249-5437
[email protected]

Chester Cubertson
(217) 749-2862
[email protected]